Kaiser Sacramento Central Utilities Plant


Project Overview

Installation of new 12 kV utility service, 12 kV – 480 transformer, 480 volt switchgear, two 1.5 MW emergency generators, automatic transfer switchgear and interconnection to existing hospital main electrical equipment requiring 24/7 operation. The project includes motor control centers serving mechanical equipment.



 

 