full
border
#666666
https://mneilsengineering.com/wordpress/wp-content/themes/smartbox/
https://mneilsengineering.com/
#147BA3
style1

Effie Yeaw Nature Center


Project Overview

This project included the construction of a new 2,400 square foot public Assembly Building, with meeting rooms, kitchen, storage and public toilet facilities, constructed adjacent to the existing Visitors Center. The electrical design included commercial normal and photovoltaic power systems, interior and exterior lighting, telecommunications cabling, fire alarm, security and video projection systems.

The electrical engineering services included the design of a new primary and secondary electrical service to serve the assembly building and the existing visitor center / natural museum and site lighting for the new parking lot. The building lighting system was designed to 90% of California Title 24 power allotment.



 

 

© 2022 M. Neils Engineering, Inc.
1
0
paged
Loading posts...
link
#6E787E
on
fadeInDown
loading
#6E787E
off
Back